Before & After

  • Complete Gut Renovation of Existing Commercial Building
  • Self-Performed Demo, Excavation, and Concrete
  • 3,000+ SF Concrete Demo
  • 2,500 SF Sub-Floor Excavation to 4' Depth
  • New Footer and Stem Wall
  • New Wood Floor Pack with Crawl Space Access
  • Dental-Specific Plumbing, Medical Gas, Nitrous, Suction, and Vacuum Lines
  • All New Plumbing, Electrical, and HVAC Throughout
  • Individual Water Line Services to Each Commercial Suite
  • Two-Hour Fire-Rated Demising Walls with Soundboard
  • ADA Compliant Bathrooms
  • Board and Batten Steel Siding by Sundance Steel
  • New Wood Beam Exterior Details
  • New Storefront Entrances and Sidelights
  • Parking Lot Excavation and Regrading
  • Interior Design Coordination with ACW Design Studios
  • Multi-Tenant and Dental Equipment Provider Coordination

Features:

With one tenant ready to move in immediately, coordination ran on multiple tracks at once: the building owners, the incoming tenant, the dental equipment provider, ACW Design Studios on interior design, and a full roster of subcontractors across every trade. Significant scope changes throughout kept the project management demands high from start to finish.

The entire building received all new plumbing, electrical, and HVAC. Exterior upgrades included board and batten steel siding from Sundance Steel, new wood beam roughs out front, and new storefront entrances. Demising walls between suites were built to a two-hour fire rating with sound board and two layers of 5/8" drywall. All new bathrooms were designed and built to ADA compliance, and the entire building was brought up to current code.

The scope on this one was significant. Roughly 3,000 to 3,500 square feet of concrete floor was demoed out, and approximately 2,500 square feet of that was excavated down four feet to accommodate all dental plumbing running beneath a new wood floor pack in a crawl space configuration. That portion of the project required pouring a new footer and stem wall. The remaining two thirds of the building were built out as individual commercial suites, each with their own new water line service, designed for a variety of future tenants.

Full Curl Construction served as general contractor for the complete gut renovation of 8008 Stage Stop in Summerset, South Dakota, completed in 2026. Originally a daycare, and a restaurant before that, the approximately 5,000 square foot building was stripped to the bones and rebuilt from the ground up as a mixed-use professional building housing a dental office and leasable commercial suites.

Out back, the parking lot required excavating and hauling hundreds of truckloads of dirt and gravel to bring the grade down to a more usable level. A playground structure left from the building's days as a daycare was disassembled and hauled off site.